职称英语综合A补全漫笔试题
各在英语愈来愈提高的21世纪,学好英语成了先生的重要方针。为赞助先生把握好英语常识,上面是小编为大师搜刮清算的职称英语综合A补全漫笔试题,但愿能给大师带来赞助!更多出色内容请实时存眷咱们应届毕业生测验网!
The World'.s Longest Bridge
Rumor has it that a legendary (传说的) six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily._________ (46) When completed in 2010,the world's longest bridge will weigh nearly 300,000 tons--equivalent to the iceberg that sank the Titanic-- and stretch 5 kilometers long. "That's nearly 50 percent longer than any other bridge ever built," says structural engineer Shane Rixon.
_________ (47) They're suspension bridges, massive structures built to span vast water channels or gorges (峡谷). A suspension bridge needs just two towers to shoulder the structure's mammoth ( 庞大的 )weight, thanks to hefty (高强度的)supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54, 100-ton towers, which will support most of the bridge' s load. The beefy (健壮的 )cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built.
When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. _________ (48) Getting these cables up will be something. It's not just their length -- totally 5.3 kilometers -- but their weight. _________ (49)
After lowering vertical "suspender" cables from the main cables, builders will erect a 60 meter-wide 54,630-ton steel roadway, or deck--wide enough to accommodate 12 lanes of traffic.
The deck's weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank (拽) up against their firmly rooted anchors with a force of 139,000 tons--equivalent to the weight of about 100,000 cars. Those anchors are essential. _________ (50)
A. Some environmentalists are against the project on biological grounds.
B. What do the world's longest bridges have in common?
C. If true, one day you might spy the beast while zipping (咆哮而过) across the Messina Strait Bridge.
D. They're what will keep the bridge from going anywhere.
E. The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.
F. They will tip up the scales at 166,500 tons--more than half the bridge's total mass.
试题谜底及剖析
46.C。选项C中有一个关头词beast,与第一句中的monster相照应。以是C是谜底。
47.B。第二段第二句的主语是they。因为表语是suspension bridges,they替换的必然是前面句子呈现过的bridges。六个选项中,只要B含有bridges。填在第二段段首,意义联贯。
48.E。空缺处前面的句子中有the first job这几个词。有first,必有second/then。六个选项中,只要E含有the second job,以是E是谜底。
49.F。空缺处前面的句子说的是,把这些吊索吊高定位是有难度的,不只仅因为它们很长,还因为它们很重。前面应当接着说吊索的环境,选项F详细地先容了它们的分量。
50.D。空缺处前面的句子说的是,桥桩很重要。前面接着还应当说桥桩的工作,选项D诠释了桥桩的感化,故选D。
【职称英语综合A补全漫笔试题】相干文章:
职称英语试题《综合A》补全漫笔操练题10-24
2017年职称《英语综合B》试题及谜底(补全漫笔)05-10
职称英语试题《综合C》补全漫笔的操练题10-24
职称英语试题《综合B》补全漫笔操练题10-24
职称英语试题《综合C》补全漫笔操练题10-24
2017年职称英语补全漫笔试题及谜底06-26
职称英语积年真题《综合A》补全漫笔10-09
职称英语积年真题综合A补全漫笔精选09-30